Give Each Signature a Job
When a water dispenser arrives on a Friday, a delivery signature tells you the boxes turned up. Set a second date for the installer to show that the equipment works at the actual serving point. Put the model, serial number, drawing revision and the name of the person who can release the equipment for use on both records.
Before the appointment, walk the delivery route and open the cabinet. The site lead should confirm the water, drain, power, ventilation and maintenance access the contract assigns to the venue. The installer should compare them against the drawing for the unit ordered and enter the measured inlet pressure and flow, how they were checked, and any discrepancy in the job record. Put a name and date next to each item that could delay installation.
Ask the Installer to Show the Work
An airport procurement spells out what a sign-off pack can contain. Airports Company South Africa’s September 2026 request for eight dispensers at O.R. Tambo called for water quality, leak, pressure and cooling checks. It also called for operating and maintenance manuals and training for its own maintenance staff. The 5–10 °C storage requirement belongs to that tender. For your site, write down the temperatures, supply conditions and tests in your own agreement.
The manufacturer’s drawings are useful at the last inch of the install. The Bestware G1DS-110 and G1DS-123 manuals both specify a maximum of 40 mm for the tap mounting and 36 mm for the drip tray. Measure both fastening locations, including any structure underneath that the fastening has to clear, and have the installer confirm the proposed fit against the drawing. The G1DS-123 manual calls for checking for piping leaks before power-up. Its initial sparkling-water check calls for bubbles and smooth flow. Record that check separately from the restaurant’s service test.
Rehearse the Orders You Expect to Serve
Set the acceptance criteria before the first pour. Specify which tap, serving size, outlet temperature, water modes and waiting time are acceptable. For example, a 15-minute order sequence of ten chilled still waters and fourteen sparkling waters at 250 mL each calls for 6 L served. It is a test script for that hypothetical venue. Ask the service team to run the orders in sequence, log temperature at the first and last pours in each mode, and count any orders past the agreed wait. Repeat under the agreed recovery interval if the venue needs a second burst.
Record who ran the test and who saw the result. Keep the vessel, measuring point, time and the conditions in the record so the next visit can repeat it. If a required check fails, list the correction, the owner and the retest date. Keep a station with an unresolved water, electrical or beverage-gas safety issue out of service until the qualified person clears it.
Come Back on a Regular Shift
At a Los Angeles middle school in a 2008 pilot, cafeteria staff logged the amount taken from five-gallon dispensers. People received reusable bottles during the launch. The school recorded 31 U.S. gallons a day in week one, about 117 L, and 10 a day in week five, about 38 L. The published figures describe what people took during a changing program. They cannot tell you the capacity of an installed restaurant dispenser.
Keep a first-week log, then agree on another check during a routine busy shift. If staff report a wait, capture the order time, the number of drinks, the water modes and where the queue formed. Check whether someone needed cups or was waiting for water before attributing the problem to the machine. Give the installer the test record and the shift log when asking for a repeat visit.
Leave a Record the Next Shift Can Use
Have the installer show the staff how to recognize the normal ready display, where to find the cleaning instructions and who is allowed to perform service work. The site lead takes the signed sheets, the installed drawing, the manual for the delivered configuration and the maintenance contacts. Put the record where the shift supervisor and cleaners can find it, with a named person for the first follow-up.
For a new or modified drinking-water system, check the local requirements for bringing it into use. The U.S. FDA’s 2026 Food Code is a model for jurisdictions. Its flushing and disinfection provision applies before use after construction, repair, modification or an emergency that may introduce contamination. Where beverage gas is installed, make sure the site’s own operating plan identifies the qualified service contact and the staff response to a fault. Put those responsibilities on the handover sheet and leave the operating instructions with the venue.
Sources for This Edition
- Airports Company South Africa — RFQ 74845, O.R. Tambo International Airport water dispensers · Original tender issued September 8, 2026, cover and physical PDF pages 8–10. Design, testing and handover requirements for the named airport procurement.
- Bestware G1DS-110/1010 Installation Manual, 2026 V1.1 · Physical PDF pp. 9–10 for cabinet and counter fit, pp. 14–15 for manufacturer commissioning and the initial sparkling-flow check.
- Bestware G1DS-123/1023 Installation Manual, 2026 V1.2 · Physical PDF pp. 9–11 for cabinet, tray and tap, pp. 15–16 for leak checking before energizing and sparkling-water commissioning.
- U.S. FDA — Food Code 2026 · Adoption language and Chapter 5 § 5-101.12, printed p. 119, on flushing and disinfection before placing the affected system in service.
- WorkSafe Victoria — Cellar and cool rooms: Beverage gas safety · Risk and workplace controls in cellars and cold rooms where beverage gas can accumulate. Victoria, Australia.
- Patel et al. — Increasing the Availability and Consumption of Drinking Water in Middle Schools: A Pilot Study · Preventing Chronic Disease, 2011. Methods: Cafeteria records. Results: Water distributed from cafeteria dispensers. One Los Angeles school, five-week 2008 program.
- Illustrative service trial: 10 still and 14 sparkling servings at 250 mL each · An assumed 15-minute restaurant order sequence for specifying an acceptance run. No equipment measurements.
- Bestware Wiki — Check Inlet Pressure and Flow · Measure at the connected supply point and record the conditions.
- Bestware — G1DS-123 · Reviewed model details and current installation documentation.
Continue With These Decisions
- How to Check Inlet Pressure and Flow for a Water Dispenser
What to measure at the actual water inlet
- How to Diagnose Flat Sparkling Water at the Tap
Check the method and what to record.
- G1DS-123
Open the G1DS-123 documents before handover