Water Service Planner

Estimate water demand, compare supply costs and check your installation site.

Peak Water Demand

Use your busiest service interval to estimate how much water you need.

How to estimate
Estimated Hourly Demand
—L/h
— US gal/h

Water served in the interval
—L
Hourly equivalent before allowance
—L/h

Use the amount you pour. The buttons reflect full glass capacities.

Planning Allowance
Estimated water served per day (optional)

Use a separate daily estimate for costs. The peak interval is not used to calculate daily volume.

Volume = servings × serving size. Hourly equivalent = volume × 60 ÷ interval minutes.

The hourly equivalent assumes the same pace continues for an hour. Confirm continuous output, cold reserve, recovery and simultaneous draw with the equipment supplier.

About the Presets

This US equipment guide uses 50 servings of 12 US fl oz in an hour for one equipment series. Use the example to explore the calculator.

Bottled vs. On-Site Water

Compare both options at the same water volume and over the same period.

Current supply cost basis

US bottled-water size catalogue

Include water, CO₂ and other volume-based costs once. Put costs charged per year below.

Annual costs and other assumptions

Total Cost Comparison

USD
Bottled Water
—
On-Site Water
—

Enter the volume, costs, operating days and comparison period to see the results.

A simple undiscounted comparison, not a savings guarantee. Financing, tax, inflation, residual value, downtime and costs not entered here are excluded. Check assumptions with your own suppliers.

Review Site Conditions

Check the Installation Site

Record what you verified and what the installer or supplier still needs to confirm.

Checklist status

Equipment space and access route

Measure the opening, working space and the route used to bring the equipment in.

Ventilation and service clearance

Record available clearance and how heat can leave the cabinet. Verify against the selected equipment.

Incoming water conditions

Record available pressure, temperature and water analysis where available; confirm any treatment needed.

Power supply

Confirm available voltage, frequency and circuit with the installer and the model specification.

Drainage and leak management

Check whether the intended system needs a drain and how leaks would be contained or detected.

CO₂ supply, if applicable

Identify the supplier, cylinder location, handling arrangements and applicable site requirements.

Cleaning and routine maintenance

Identify the responsible person, service access, cleaning schedule and consumable replacement plan.

Service, spare parts and responsibility

Confirm who supplies, installs, commissions and supports the system in the project location.

Project outline — optional
Available clear space — optional

Choose the unit before entering dimensions.

Site Notes (Optional)

Project Brief

Keep a copy or review the brief with your inquiry.

Peak demand
—
Cost comparison
Awaiting cost inputs
Site checks
—

        

Continue to Inquiry

You can add the brief to your inquiry in this tab before submitting.