Put the Same Water Order on Both Drawings
Before you choose between an all-in-one and a split system, ask both suppliers to draw the cabinet for the same order. List the water you expect to serve, the tap position, the supply and drain points, and which parts come with the equipment. One tap can serve water from several units. The drawing should show which box performs each job and where pipes and controls connect.
Bestware’s G1DS-110 illustrates an all-in-one layout. Its manual shows a tap assembly above one main unit, with water treatment and gas planned around it. The G1DS-123 diagram shows a shared tap connected to a separate chiller and heater. Use those names to identify equipment on a drawing. For the purchase, ask what will be on your packing list and who will provide the parts that stay on site.
Check Two Cabinet Bays on Paper
The 110 manual shows a 355 × 464 × 438 mm chassis within a 425 × 500 × 630 mm placement envelope. The 123 chiller uses the same two sets of dimensions. The separate 123 heater is 230 × 322 × 438 mm and has its own 330 × 500 × 630 mm envelope, with access to the power switch on its left. All dimensions are width, depth and height. The 123 product page separately lists a minimum base-cabinet size for the units of 810 × 500 × 630 mm. Ask for the drawing for the units and options you plan to order.
Suppose an existing bar has clear bays of 440 × 510 × 640 mm and 345 × 510 × 640 mm, with a fixed divider between them. On a first check, the wider bay covers the 110’s placement envelope or the 123 chiller’s. The smaller bay covers the 123 heater’s envelope. The split option therefore raises a real question for the drawing. Can the approved cables and tubes pass through the divider and still leave access to both units? If the smaller bay is assigned to the heater, draw a separate place for any optional RO unit before approving that quote. This screens two individual spaces. Check the catalog’s 810 mm cabinet figure against the complete, order-specific drawing.
Follow the Route From the Door to the Connections
Take the front, side and plan views to the actual cabinet. Record the finished opening between the hinges, the clearance above the floor rail and the route by which each unit comes in. Behind and above the equipment, leave room for the approved fittings, cable and tube runs, and their movement during service. On the same sheet, check the side air inlets, the outlet at the front of the cooling equipment and the finished grille. A bulkhead or a stack of cups has consequences once the door closes.
At the countertop, identify the tap hole and the drip tray separately. The corresponding installation drawings give a 40 mm worktop maximum for the tap and 36 mm for the tray. Get the final hole templates and the installed thickness at those two locations before cutting. Ask for shipment dimensions separately if the crate also needs to clear a tight doorway or turn.
Put the Tap Harness and the Options on the Quote
The 110 and 123 connection drawings show communication cables as well as water lines. On the 123, the tap, chiller and heater form the specified arrangement. The 123 revision record also identifies an update to the hot-water display. Ask the supplier to list the exact tap, units and cable revisions and to approve the route and lengths on your layout. Treat a different tap or longer harness as a change to be signed off before the cabinet is made.
Both manuals draw the Bestware reverse-osmosis box as an option, with its own power connection and wastewater path. Both installation drawings show 190 × 500 × 630 mm for this manufacturer’s separate RO box. Mark the option on the plan if the water and purchase scope call for it. For sparkling service, put the external CO₂ cylinder, regulator and fixed location on the drawing and identify who provides them. Keep each item, the drain it uses and the access needed to service it visible when you compare the two prices.
Release the Order With One Agreed Drawing
Have the equipment supplier confirm the exact assembly, the cabinetmaker confirm the openings and clear spaces, and the site trades confirm water, power, drains and ventilation. The buyer then references that drawing and revision on the order. Review any substituted part against the drawing before approving the change. Carry the agreed inlet conditions, outlets and busy serving sequence into the acceptance check so either proposal is judged on the same duty.
Which arrangement should you buy? Release the one whose complete drawing fits, whose listed interfaces are approved, and whose remaining site work has an owner. Keep the model numbers and drawing revision on the handover sheet. Once the installation is settled, take the separate question of what happens during a repair to your service comparison.
Sources for This Edition
- Bestware · G1DS-110 / G1DS-1010 Installation Manual, 2026 V1.1 · PDF pp. 8–13, assembly, placement, cabinet and worktop, gas arrangement and tap connection. Optional RO appears on pp. 8–9 and 13.
- Bestware · G1DS-123 / G1DS-1023 Installation Manual, 2026 V1.2 · PDF pp. 8–14, chiller and heater, cabinet, optional RO, CO₂ and tap. Full connection diagram on p. 14, revision history on p. 18.
- Bestware · G1DS-123 4-in-1 Product Specifications · Minimum Base Cabinet Size for Units note and Tap Communication Interface entry.
- Karl Ulrich (1995) · The Role of Product Architecture in the Manufacturing Firm · Research Policy 24(3), pp. 419–440. Abstract, introduction and definition of product architecture.
- Bestware · Integrated vs. Split Sparkling Water Systems · Background on layouts and interfaces. Model dimensions in this guide come from the installation drawings.
- Bestware · Integrated Sparkling Water Taps System vs. Separate System · Background on tap functions and separate equipment, with project scope to be verified at order.
- Bestware editorial worked example · Two bays separated by a fixed panel · Illustrative clear dimensions only. Check placement boxes before confirming the access, routes and complete scope.
- Bestware Wiki · Installation, power and cooling before a delivery · Review the installation site, clearances and connections before accepting a delivery.
- Bestware Wiki · Modularity and repairability · Compare how an approved unit can be taken out of service and which support applies.
Continue With These Decisions
- Check the Finished Cabinet Before Your Water Dispenser Ships
Check power, cooling and drainage before delivery
- How to Check if a Modular Water Dispenser Is Repairable
Compare repair access and service for modular systems