Start With Two People at Work
Start with a full carafe and a place to set it down. Have one person fill two of your largest carafes and take them to the service pickup. Ask someone else to return a tray of used glasses at the same time. If the second person has to wait for the first to move, shift the return or pickup point on the plan and try again.
Use tape to mark the counter edge, sink, tray and cabinet door swing at full scale. Put the tallest vessel under the proposed tap and check that it can come away full without catching the spout. Leave room to land a wet carafe without blocking the next fill. A minute in this mock-up can tell you exactly where to ask the cabinetmaker for a change.
Where Other Bars Put the Washing
During the fit-out of the 26-seat Bistrot des Tournelles, the installer had to find a low refrigeration unit and work around an old bar front the owners wanted to keep. The chilled, filtered water stayed at the bar, with a drain grid under the column. They put the glass-washing sink in the main washing area near the back of house.
On a different job, the A-301.00 plan for New York’s Carriage House sets out the bar from above and draws it again at eye level. The equipment schedule and elevations show where the glass washer, cocktail stations and hand sink are meant to go. The drawings describe the proposed layout. For your own bar, ask for both views. A space that looks empty on plan can already contain a drain, a bracket or the underside of a sink.
Measure the Finished Opening Before You Order
The Bestware G1DS-110 manual is a useful example of the difference between a housing and its space allowance. It lists the housing at 355 × 464 × 438 mm, width by depth by height. The illustrated minimum is 425 × 500 × 630 mm, including 35 mm of side clearance on each side. The cabinet-door grille is shown aligned with the unit’s air outlet.
Say the finished cabinet has 445 mm between its sides where those clearances are needed, with a fixed support taking up 30 mm. There are 415 mm clear. The housing is narrower, but the proposed bay is 10 mm short of the drawing’s width allowance. Ask for a revised bay or a different documented layout before fabrication.
Measure the mounting thickness from underneath at each hole. On a 38 mm mounting surface, the manual’s 40 mm tap limit leaves room on thickness alone. The same surface exceeds the 36 mm tray limit. Take the two cutout details to the cabinetmaker with the actual material build-up marked.
Run the Handover With the Bar Stocked
Draw the access door, shutoff, filter and service route at the same time as the tap and drain. Have the installer show the opening needed to reach each part and withdraw the unit for service. A shelf that can be removed before installation may be hard to reach once the sink and storage are in place.
At handover, use the real glass rack and stock bins and rerun the fill and return while another person watches. Have the installer check drainage and show that the grille still has a clear air path with the doors shut. Write down any wait, blocked door or awkward lift and who will retest it after the adjustment.
Sources for This Edition
- Bar Circus · Micro bar sur-mesure du Bistrot des Tournelles · French installer account, first five paragraphs. Existing front and period marble requested for retention. Low undercounter refrigeration, chilled filtered water column with drain grid and separate glass-washing sink near the service area.
- Manhattan Community Board 2 filing · The Carriage House bar plan, Architectura sheet A-301.00 · PDF p.15. B Bar Floor Plan, B2 back bar and B3 bar equipment elevations, B4 flip-up access; equipment schedule rows 31–35. Proposed drawing separates cocktail stations, glass washer, hand sink and service/coffee. Filed design only.
- Bestware · G1DS-110 / G1DS-1010 V1.1 Installation Manual · PDF pp.9–10, printed pp.13–16. All-in-one housing 355 × 464 × 438 mm W × D × H; drawing minimum 425 × 500 × 630 mm with 35 mm on each side and door grille aligned to the outlet. Tap mounting maximum 40 mm; drip-tray mounting maximum 36 mm.
- Planning examples · Two-person walkthrough and dimensional screens · Illustrative finished clear bay widths only. EN 445 − 30 = 415 mm; ES 470 − 50 = 420 mm; ZH 435 − 20 = 415 mm. Compare to the specific 425 mm clearance drawing. A 38 mm example passes the 40 mm tap thickness screen and exceeds the 36 mm tray maximum. Walkthrough yields site-specific evidence only after someone runs it.
- Bestware Wiki · Match Dispensing Flow and Containers · Check how the service vessel goes under the tap, tilts to leave and carries to the handoff point.
- Bestware Wiki · Water System Installation and Handover · Assign the prep, commissioning and sign-off checks, including access and a repeat during actual operation.
Continue With These Decisions
- How to Check Inlet Pressure and Flow for a Water Dispenser
Check the method and what to record.
- Water Dispenser Installation and Handover: What to Sign Off
Check the method and what to record.
- G1DS-110
Check the equipment and installation conditions.

























