Put the Same Job on Every Quote
Ask every bidder to price the same job. Send a sketch of the bar and the actual serving schedule. Ask for a line against each item: tap and drip tray, chilling and any heating modules, treatment, CO₂ supply, controls, connections, cabinet work and commissioning. Who supplies it, who installs it and is it in the quoted price? An offer that leaves the drain and ventilation to the restaurant should say so on the page you will compare.
Include the offered model and configuration on the quote and drawing. If treatment or a different finish is optional, show the price and lead time beside that option. When you need customization, ask what the minimum order and sample approval cover. A finish panel can settle color. Use the intended production configuration for the trial that will decide whether the station can serve the room.
For each certificate or treatment claim in the quote, record the issuer, model and exact configurations covered. Get a written correction if a document describes a different offer.
Count the Half Hour and the Five-Minute Rush
Picture a restaurant that fills 20 sparkling-water bottles of 750 mL in half an hour. It fills 12 of them in the first five minutes, takes a four-minute break, then fills eight more over five minutes. The whole half hour comes to 15 L. Enter the whole period in the calculator and a 20% planning allowance, if that is what you want to carry. In this example the estimate goes from 30 to 36 L/h and points to a G1DS-123 by its published chilling rating.
Keep the first wave on the quote. It requires 9 L in five minutes, an average of 1.8 L/min. The G1DS-110 lists 20 L/h chilling and up to 1.5 L/min at the sparkling outlet. Even that published outlet ceiling falls short of the illustrative first wave. The G1DS-123 lists 40 L/h chilling and up to 3 L/min sparkling. Take it forward for a trial under the agreed conditions. Time the bottles, then record what comes out at the end of each wave and after the break.
Open the half-hour example in the restaurant capacity calculator
Ask Which Box Goes Where
Suppose the only assigned bay measures 460 mm wide, 520 deep and 650 high. On the V1.2 drawing, the G1DS-123 chiller’s minimum envelope is 425 × 500 × 630 mm, so the clear bay exceeds those three numbers on paper. The heater is a separate box. Ask where it goes and how staff reach the switch and service points. Have the supplier show the ventilation opening, drain route and space to exchange the CO₂ cylinder and any filter. Until those fit the marked drawing, leave the installation item open.
The G1DS-110 combines its units in one housing, which changes the drawing and the price of site work. Capacity and fit are separate lines for either offer. Ask the installer to confirm the proposed arrangement before anyone cuts the cabinet or moves a utility.
Check the G1DS-123 module specifications and the installation drawing
Put a Date and a Witness on the Test
In its June 2026 sparkling-water rental solicitation, Los Angeles World Airports asked the contractor to survey power, water, drainage if needed and clearance before installation. The technical attachment gave the contractor 20 business days from the notice to proceed, subject to city-approved exceptions. It also called for a functionality test and basic user orientation at installation, with on-site service within 24 business hours of notice for specified incidents unless otherwise approved. These were bid requirements for that rental.
For a restaurant order, fill in who runs the two rounds and who signs. Record inlet and room conditions, the elapsed time and the outlet temperature at the agreed points, along with the agreed acceptable range. Keep the offered equipment and filters in the test setup. If the result falls short, write down who corrects what and which sequence has to be repeated before acceptance.
Make the Purchase Order Match the Handover
Keep the signed drawing, model and serial details, operating instructions, run sheet and remaining work together. Ask who supplies cylinders, filters and parts, who can dispatch a technician, and what the warranty covers for labor and travel. Tie drawing approval, dispatch and site readiness to their own dates so a factory lead time cannot stand in for the opening date.
For a cross-border order, record the agreed Incoterms rule, named place and version. It helps allocate transport duties, costs and risks. Put payment, ownership, installation, acceptance and remedies in the purchase agreement as well.
Sources for This Edition
- Bestware · G1DS-110 · All-in-one specifications, rows 4 and 8. Chilling rating 20 L/h; maximum sparkling outlet flow 1.5 L/min.
- Bestware · G1DS-123 · Chilling Unit specifications, rows 5 and 10. Chilling rating 40 L/h; maximum sparkling outlet flow 3 L/min. Separate Heating Unit table.
- Bestware · G1DS-110 / 1010 Installation Manual, 2026 V1.1 · PDF p. 9, printed pp. 13–14, Required Space and Placement Requirements. All-in-one unit and its minimum installation envelope, independent from other equipment.
- Bestware · G1DS-123 / 1023 Installation Manual, 2026 V1.2 · PDF pp. 9–11, printed pp. 13–18. Chiller envelope 425 × 500 × 630 mm (W × D × H); separate heater envelope and switch access; water, electrical, drainage, grilles and cylinder placement.
- Illustrative restaurant purchase and cabinet · Illustrative, not measured. 20 bottles × 750 mL in 30 minutes. First 12 in 5 minutes (9 L, 1.8 L/min average); after a four-minute pause eight in five (6 L). Empty bay measured 460 × 520 × 650 mm (W × D × H), no other assigned positions. 20% calculation allowance gives 36 L/h on a 30 L/h half-hour basis.
- City of Los Angeles / Los Angeles World Airports · Sparkling Water Hydration System Rental Services, 0442-2026-04-RFB-230478 · Original June 2026 solicitation, technical attachment 1-00 §§4.1–4.2, 5.3. Site survey, 20 business days from Notice to Proceed unless approved otherwise, function test and orientation, 24 business hours for on-site service on notice unless approved otherwise. Rental bid requirements.
- Bestware · OEM and ODM services · FAQ, minimum order quantity varies with the specific project and customization requirements.
- Bestware Sparkling · OEM and ODM options · Commercial sparkling equipment customization section; Logo Customization. Check options against the exact quote.
- International Trade Administration · Know Your Incoterms · What Incoterms cover, named place and agreed version. The sale agreement separately addresses acceptance, payment and other contract terms.
- Bestware · Restaurant Sparkling Water Capacity Calculator · Worked inputs 20 bottles, 30 minutes, 750 mL, 20% allowance. Calculates water demand and a chilling-rating reference.
- Bestware · G1DS-123 model and installation details · Model specification and manual. Check the actual quoted configuration on the drawing.
Continue With These Decisions
- How Much Chilled Water Does Your Busiest Half Hour Need?
Work out how much chilled water the busiest interval requires.
- Restaurant Sparkling Water Capacity Calculator
Put your bottle count, size and service window into a demand estimate.
- Commercial Sparkling Water Dispensers for Restaurants
Compare commercial layouts and see which model and installation records you need.