Start at the Desk and Walk the Trip
Put an office water station where people already pass, with a spot to step out of the lane while they fill. Start at the far desk and walk with a bottle in hand. Follow the route a guest would be allowed to use, and do it again while the office is busy. A point past a secure door works for a different group from one off the main lobby. Mark the people who can use each candidate on the plan.
HDR’s own account of its Arlington office puts a bottle filler in a busy third-floor area of a two-level workplace. The UCSF faculty office building brief took a related idea down to the drawing. Make the pantry easy to find from a major route and give quiet work zones some separation. Those are useful questions for your floor. Look for a place where a coworker can take a bottle out of a bag and pause without moving a chair or standing in front of a meeting room door.
Time One Fill From Arrival to Departure
Observe a morning arrival, a meeting break or the busiest shift change before picking a model. Time how long each person occupies the outlet, from setting the bottle in place to putting the cap back on and stepping aside. Note bottle size and water mode. On the drawing, mark where the next person waits and where a growing line would cross a door, a coffee queue or an exit route. Record how long it takes to walk there from the desks.
Suppose two meetings end together. Eight people come from one room and four from the other. Each wants 500 mL, and a turn is assumed to take 35 seconds. With everyone arriving together at one outlet, the last person steps away after seven minutes. With two independent outlets serving the two groups at the same rate, the busier one finishes in four minutes and 40 seconds. The other finishes in two minutes and 20 seconds. Both arrangements serve six liters. Those numbers cover time at the outlet. Check doors and the return walk, and measure the actual cycle with the proposed equipment before signing a plan.
Review the Accessible Route on the Finished Floor
Keep the approach, controls and path out visible on the finished-floor drawing. Ask the project’s accessibility lead to check it with the chairs in place, the door open and the usual bottle set at the outlet. Try it again with someone else waiting. Put any floor mat, bin or cabinet handle on the drawing if it changes how the point can be approached.
For U.S. projects within the ADA standards, the Access Board distinguishes fixed bottle fillers and water coolers from drinking fountains. Fixed filling stations have accessible route, approach and operable-part provisions. Where a project provides drinking fountains covered by the standards, use those scoping and technical rules to specify the wheelchair-accessible and standing-height arrangement. Check any separate local plumbing or building requirement with the project lead.
Ask the Installer to Mark the Space Behind the Tap
Give the installer both the plan view and the cabinet elevation. Ask them to mark the potable supply, isolation valve, specified power, drainage where needed, and the space to remove a filter or open a service panel. Leaving that space clear matters when the cupboard is full of supplies. Ask the building team to confirm that the cabinet door and drain can fit while preserving the approach you have already checked.
For example, the Bestware G1DS-110 V1.1 drawing gives a maximum worktop thickness of 40 mm at the dispensing tap and 36 mm at its drip tray. It also shows the cabinet grille aligned with the unit’s exhaust. Check both component positions and the cabinet door on the signed drawing. When the office is finished, check again how people reach and use the outlet.
Approve the Point With the People Who Will Use It
Before ordering for the whole office, mock up the site with the longest bottle expected in daily use and the actual furniture position. Run one busy and one quiet stretch with the same small group at each candidate. Record where people stood, whether a guest got to the outlet and whether anyone at the nearest desk noticed noise when the equipment ran. Compare putting the point in a recess with adding a second point using what people actually did.
Put the chosen location, exact model and options, connections, approach conditions and service owner on one sheet. At handover, walk the approved route again with the coordinator, test the installed outlet and leave instructions where the person on duty can find them. Keep observations that could change the choice for another floor, such as a different door schedule or larger bottles.
Sources for This Edition
- HDR · 2018 Sustainability + Corporate Responsibility · Printed p. 69, Arlington office case study. A third-floor bottle filler in a busy area; no queue measurements.
- UCSF Mission Bay Block 25A · Academic Office Building RFP, Project M1623 · June 28, 2012, printed p. 103, Pantry: function, layout and wayfinding. Project brief.
- Ayuntamiento de Alicante · Pliego de suministro y mantenimiento de fuentes, EHLC2023000007 · Signed September 5, 2023, printed pp. 3 and 9–10. The office lead identifies exact locations after a change.
- 广州市水务局 · “最后一公里”再延伸:广州水务为企业量身打造管道直饮水系统 · November 16, 2026, Guangzhou China Mobile Information Building. Central treatment and supply zones; the report gives no terminal count.
- U.S. Access Board · Guide to the ADA Accessibility Standards, Chapter 6 · Water Coolers and Bottle Fillers. Scoping §211, drinking fountains §602 and operable parts §309.
- España · Real Decreto 486/1997, lugares de trabajo · Article 9 and Annex V A.1 and B on potable water. Annex II.1 on keeping routes and exits clear.
- 住房和城乡建设部 · GB 55019-2021 建筑与市政工程无障碍通用规范 · PDF p. 17, printed p. 14. Sections 3.6.2–3.6.4 on low-position facilities, turning space and installed dimensions.
- Bestware · G1DS-110 / G1DS-1010 installation manual, 2026 V1.1 · PDF pp. 9–10 and 13. Cabinet ventilation, component-specific worktop limits, and water connection.
- Bestware editorial example · Two meeting rooms release together · Planning example. Twelve fills at 500 mL, assumed 35 s per complete turn. Walking time is recorded separately.
- Bestware Wiki · Cabinet ventilation and service access · Check airflow with the finished cabinet and installed components.
- Bestware Wiki · Hand over a water station to the site team · Record the installed point, documents, and roles for ongoing operations.
Continue With These Decisions
- How to Plan and Check Airflow in a Water Chiller Cabinet
Check the cabinet airflow and service opening
- How to Hand Over a Water Station to the Site Team
Hand over the installed station to the team on duty