Ask Where Each Quote Leaves the Job

One quote ends with a machine at the loading dock. Another ends with the water running, staff trained and the test sheet signed. Before comparing either number, ask which equipment arrives, how it gets to the counter and who gets it ready for the first day of service.

Give both bidders the same drawing, service target and installation conditions. Ask for lines that identify filters, CO₂ arrangements where relevant, site labor and commissioning. Compare currency, tax basis, freight and the delivery point. Put a name against any work outside the supplier’s price.

Send bidders one installation and acceptance checklist

[6] [7]

A Public Bid Shows Why the Column Matters

In April 2023, the United Independent School District in Texas recorded a recommended final offer of US$706,800 for districtwide bottle-filling station plumbing upgrades. The tabulation starts at $661,300, subtracts a voluntary $4,500 deduction and adds a $50,000 contingency subject to district use and approval. The figure comes from the recommendation and bid packet.

The same packet lists a $1,900 unit price for a bottle-filling station and a separate $250 unit price for an electrical circuit and receptacle. Those lines help price a specified item. A project budget has a different scope, along with any allowance the buyer controls. Keep each number under the right heading when comparing offers for a new site.

[1]

Open the Cabinet on the Model Sheet

Bestware’s G1DS-123 and G1DS-1023 are both cataloged as four-function undercounter systems. The G1DS-123 listing is for the version without RO filtration. The G1DS-1023 lists a separate reverse-osmosis module. The V1.2 installation manual shows room for the modules and a connection diagram for the setup with RO. A countertop photo cannot show the buyer which parts and connections are in the box.

Ask for the quote date, model suffix, a parts and revision list, and the wiring and plumbing drawing that goes with it. If a supplier proposes a different filter or a revised controller, get the new reference and check the connections, installation space, documents and performance evidence it changes. Price the substitution only after approving what it will do.

[2] [3] [4] [7]

Price the Same Two Years, Then Explain the Gap

Suppose two proposals meet the same performance test. In US dollars before tax, A starts with $2,400 of hardware, plus $150 freight, $700 installation and $200 startup. It is $3,450 ready to serve. B is $3,200 ready to serve, with freight, installation, startup and the first of two planned service visits included. The example gives both systems two $120 filter sets and sets the price of each visit still payable at $180.

Over 24 months, A adds two filter sets and two visits to reach $4,050. B adds two filter sets and one paid visit to reach $3,620. That is a $430 difference in this simple cash comparison. NIST’s life-cycle handbook puts alternatives on a common study period. At your site, use a common period and replace each example amount with the supplier’s price and the service plan you can check.

Put purchase, rental and service offers on the same period

[6] [5] [8]

Sources for This Edition

  1. United Independent School District · CSP 001-2023 Board Packet, April 2023 · PDF p. 1 agenda action item, p. 2 March 27 recommendation memorandum, p. 3 bid tabulation/unit prices. USD 661,300 base −4,500 voluntary deduction +50,000 contingency for district use/approval only = 706,800 recommended offer. Listed bottle filling station unit price USD 1,900, separate electrical circuit and receptacle line USD 250. This is a documented bid, not final paid cost.
  2. Bestware · G1DS-123 Undercounter System without RO Filtration · Active configuration title and Details, 4-in-1 variant without RO filtration; distinct chilling and heating module tables. Named configuration only.
  3. Bestware · G1DS-1023 Undercounter System with Standalone RO · Configuration title and RO Filtration Unit table, standalone RO. Cartridge models and water requirements must follow the actual offer and assembly.
  4. Bestware · G1DS-123 / G1DS-1023 V1.2 Installation Manual · PDF p. 9 (printed pp. 13–14), space for heating, chilling and optional RO units; p. 14 (printed p. 24), connection drawing shows configuration with RO and its interfaces.
  5. NIST · Life Cycle Costing Manual, Handbook 135e2025 · §2.4, Set the Study Period, especially 2.4.1 and 2.4.2. Establish consistent study/service period for alternatives. Draft example is an undiscounted quote comparison.
  6. Illustrative two-quote installed and 24-month cost comparison · USD pretax, no discounting. A 2,400 equipment + 150 freight + 700 installation + 200 commissioning = 3,450; both pay two 120 filter sets in forecast, A pays two 180 visits, total 4,050. B 3,200 installed/startup (includes freight and one visit), two 120 sets plus one 180 paid visit = 3,620. Difference 430 over 24 months for assumed same functionality/schedule.
  7. Bestware Wiki · Commercial Sparkling Water Purchasing Checklist · Give bidders installation constraints, required service output, commissioning and acceptance evidence.
  8. Bestware Wiki · Compare Purchase, Rental and Subscription · Normalize the support terms, replacement expenses and charges to compare offers over the same service period.