Two Kinds of Water Equipment on One Stand

GUEXT ran October 15–17, 2026, at IFEMA MADRID. Bestware’s report on October 16 placed its exhibit in Hall 12 at stand 12C16. One photograph shows a drinks tap and drip tray at the left of the display. A sink and several fittings sit beside them, with spring-coiled pre-rinse faucets visible in a second photograph.

Bestware listed cold, hot, sparkling and room-temperature water for the commercial system it presented. The display also included pre-rinse and sensor faucets.

[1] [2] [3] [4] [5]

The View From a Restaurant Counter

For a restaurant looking at the drinks side of the display, start with the carafe. Can it sit flat on the tray and still clear the tap? On the rinse side, a buyer replacing a faucet at an existing sink wants to know where it mounts and whether the spray head reaches the far corner. Measure those points at the restaurant before asking the supplier to check the layout.

[3] [4] [8]

Give the Supplier a Rush to Plan For

Say a dining room needs twelve 500 mL carafes in four minutes. That works out to six liters at an average demand of 1.5 L/min. In Bestware’s catalog the G1DS-110 lists 20 L/h of cooling capacity and a maximum sparkling-water flow of 1.5 L/min. The G1DS-123 lists 40 L/h and 3 L/min on those same two lines. These are published model figures for comparison after the show. For that four-minute rush, ask for a timed run on the configuration being quoted and record the temperature of the first and last carafes.

Build a commercial sparkling-water purchasing checklist

[6] [7] [9]

Put the Actual Counter on the Drawing

Send the installer the vessel height, the countertop thickness at the tap and at the tray, and the available cabinet space. The G1DS-123 / G1DS-1023 manual, for example, shows the tap and drip tray in separate drawings and gives the chilling unit its own clearance and ventilation requirements. Once the model is chosen, record who will verify those details and who will accept the installed equipment.

Plan installation and handover for the chosen unit

[8] [10]

Sources for This Edition

  1. IFEMA MADRID · GUEXT Dates and Venue · Event date and venue. October 15–17, 2026, at IFEMA MADRID.
  2. Bestware Stainless · Meeting Commercial Water Needs at GUEXT 2026 · October 16, 2026, company report. Event Information gives Hall 12 and booth 12C16. Featured Products lists the water equipment and faucets.
  3. Bestware Stainless · GUEXT Display Photograph · Company photograph in the October 16 report. A drinks tap and drip tray are visible beside the sink display.
  4. Bestware Stainless · GUEXT Pre-rinse Display Photograph · Company photograph in the October 16 report. Spring-coiled fittings are visible over the sink.
  5. Bestware Stainless · GUEXT Booth Photograph · Company photograph reproduced at the top of this article. Several people are beside the display.
  6. Bestware Sparkling · G1DS-110 Specifications · Specification entries for Chilling Capacity (20 L/h) and Sparkling Capacity (maximum 1.5 L/min).
  7. Bestware Sparkling · G1DS-123 Specifications · Specification entries for Chilling Capacity (40 L/h) and Sparkling Capacity (maximum 3 L/min).
  8. Bestware · G1DS-123 / G1DS-1023 Installation Manual, 2026 V1.2 · PDF pp. 9–11. Chilling-unit clearance and ventilation, drip tray on p. 10, and tap on p. 11. The two fixtures have separate countertop thickness limits.
  9. Bestware Wiki · Commercial Sparkling Water Purchasing Checklist · Service volume, peak flow and the information needed for a controlled test.
  10. Bestware Wiki · Water System Installation and Handover · Installation checks and the record passed to the operating team.

Continue With These Decisions