## How to Verify a Supplier’s Renewable Electricity Claim

Ask for the factory, period, metered electricity and retirement record. Work out how much electricity those documents cover before repeating the supplier’s claim.

Revised 2026-11-25

A technician works beside a row of water units at a factory test line

On this page

[Start With the Factory’s Electricity Bill](https://www.bestwaresoda.com/wiki/verify-supplier-renewable-electricity-claims/#section-1) [Follow Who Holds and Retires Each Certificate](https://www.bestwaresoda.com/wiki/verify-supplier-renewable-electricity-claims/#section-2) [Put the Receipts Against the Metered Total](https://www.bestwaresoda.com/wiki/verify-supplier-renewable-electricity-claims/#section-3) [Give the Two Scope 2 Results Their Own Lines](https://www.bestwaresoda.com/wiki/verify-supplier-renewable-electricity-claims/#section-4) [Date the Guidance Alongside the Claim](https://www.bestwaresoda.com/wiki/verify-supplier-renewable-electricity-claims/#section-5)

### Start With the Factory’s Electricity Bill

Before you pass on a supplier’s renewable electricity claim, ask for the address, the reporting period and the amount of electricity used. A contract may cover an office, a production site or a group of meters. Match the name on the bill and the meters in the calculation to the site making the equipment on your order.

Start with the period you can close. Ask for dated bills or meter records, plus a schedule showing any electricity generated and used on site. Record excluded areas, such as a separate supplier's workshop or another factory. If the supplier has signed a contract that starts next quarter, keep the planned purchases in the next-quarter file.

The same boundary check helps when a supplier sends a corporate rating. Look up the entity and sites covered before filing it with a specific plant.

[Check the scope of the supplier’s sustainability rating](https://www.bestwaresoda.com/wiki/check-supplier-sustainability-rating-evidence/)

[\[1\]](https://www.bestwaresoda.com/wiki/verify-supplier-renewable-electricity-claims/#editorial-source-1) [\[12\]](https://www.bestwaresoda.com/wiki/verify-supplier-renewable-electricity-claims/#editorial-source-12)

### Follow Who Holds and Retires Each Certificate

In the United States, one Renewable Energy Certificate (REC) represents the attributes of one megawatt-hour (MWh) of renewable generation. Request the quantity, generation period, market and certificate identification, then find the retirement in the supplier’s name or on its behalf. A trader’s invoice records a transaction. Check the tracking record to see who received the attributes and for whose consumption they were retired.

Look at the roof separately from the paperwork. If the owner sells the RECs from the site's solar system, leave those attributes out of its renewable claim. An actual public report shows how different the entries look. The US EPA says it obtained 8.5 million kWh of Green-e certified RECs in fiscal 2025 to supplement its own onsite renewable generation. That is the agency’s certificate purchase, with its timing and purpose, and gives no percentage for an individual facility.

In Spain, ask the supplier for the CUPS code that identifies the factory’s electricity supply point. The holder of a generating installation or an electricity retailer can request redemption. A retailer can do so only for customers it supplied in the corresponding months. Have the customer retrieve the CUPS entry checked and recorded by the national regulator, CNMC.

In China, ask for the system-generated GEC retirement sheet for the factory’s renewable electricity consumption claim. Match the holder, use, date and place. From January 1, 2026, the generation year and consumption year must match and the volume should generally stay within the electricity actually used for that claim. China’s rules treat GECs for electricity generated and consumed on site as non-tradable.

[\[3\]](https://www.bestwaresoda.com/wiki/verify-supplier-renewable-electricity-claims/#editorial-source-3) [\[4\]](https://www.bestwaresoda.com/wiki/verify-supplier-renewable-electricity-claims/#editorial-source-4) [\[2\]](https://www.bestwaresoda.com/wiki/verify-supplier-renewable-electricity-claims/#editorial-source-2) [\[5\]](https://www.bestwaresoda.com/wiki/verify-supplier-renewable-electricity-claims/#editorial-source-5) [\[6\]](https://www.bestwaresoda.com/wiki/verify-supplier-renewable-electricity-claims/#editorial-source-6)

### Put the Receipts Against the Metered Total

Take an illustrative purchase of commercial water dispensers from a plant in the United States. Between April and September 2026, the site used 540 MWh. It can match 420 MWh of eligible, retired certificates to the plant, entity and period. The 540 MWh includes 50 MWh used from its own rooftop system. In this example the rooftop RECs were sold and the plant obtained no eligible replacements for that volume. The 50 MWh stays in the plant’s consumption total.

The evidence supports 420 out of 540 MWh, or 77.8% to one decimal place. Split the remaining 120 MWh into two rows. Record 50 MWh with the rooftop attributes sold and unreplaced, then ask for evidence for the other 70 MWh. This is a worked example. A specific Bestware order would need the information for the site actually making the chosen configuration.

Keep a meter-level record and a certificate list for the review. Add a column for the holder and retirement beneficiary, the applicable market, the generation and consumption periods, and any volume left open. For the electricity consumed after a dispenser is installed, use separate measurements under defined operating conditions.

[Measure the dispenser’s electricity use at the customer site](https://www.bestwaresoda.com/wiki/measure-dispenser-energy-use/)

[\[11\]](https://www.bestwaresoda.com/wiki/verify-supplier-renewable-electricity-claims/#editorial-source-11) [\[4\]](https://www.bestwaresoda.com/wiki/verify-supplier-renewable-electricity-claims/#editorial-source-4) [\[1\]](https://www.bestwaresoda.com/wiki/verify-supplier-renewable-electricity-claims/#editorial-source-1) [\[13\]](https://www.bestwaresoda.com/wiki/verify-supplier-renewable-electricity-claims/#editorial-source-13)

### Give the Two Scope 2 Results Their Own Lines

The GHG Protocol 2015 guidance distinguishes a location-based result using grid emissions information from a market-based result based on qualifying contractual information and applicable factors. It calls for both where the company has operations in markets providing the relevant contractual information. A properly supported electricity share also leaves the material, transport, use and end-of-life stages of the product to be calculated in their own way.

Brander and colleagues ask a different question in their Energy Policy paper. What evidence shows that an accounting change led to new generation or fewer emissions on the wider grid? Keep that question open when reviewing a supplier’s contract. An associated electricity claim belongs in the inventory for the specified site and period. An avoided-emissions claim needs evidence of what changed because of the purchase.

[\[1\]](https://www.bestwaresoda.com/wiki/verify-supplier-renewable-electricity-claims/#editorial-source-1) [\[8\]](https://www.bestwaresoda.com/wiki/verify-supplier-renewable-electricity-claims/#editorial-source-8)

### Date the Guidance Alongside the Claim

Write down the guidance version the supplier applied. GHG Protocol’s October 16, 2026 update describes the hourly matching and deliverability proposals that went through consultation. A November 10 workshop overview records those discussions and leaves thresholds and the treatment of existing contracts open. The overview distinguishes proposed hourly evidence from a duty to buy certificates for every hour of the year.

For this purchase, sign the evidence you have for the site, quantity and completed period. Add a review date if a new meter, facility, contract or reporting framework will change how that quantity is recorded.

[\[9\]](https://www.bestwaresoda.com/wiki/verify-supplier-renewable-electricity-claims/#editorial-source-9) [\[10\]](https://www.bestwaresoda.com/wiki/verify-supplier-renewable-electricity-claims/#editorial-source-10) [\[1\]](https://www.bestwaresoda.com/wiki/verify-supplier-renewable-electricity-claims/#editorial-source-1)

### Sources for This Edition

1. [GHG Protocol · Scope 2 Guidance](https://ghgprotocol.org/sites/default/files/2023-03/Scope%202%20Guidance.pdf) · 2015 guidance, sections 1.5.1 and 6.3, Chapter 7 Table 7.1 on printed page 60. Reporting methods, activity data and quality criteria.
2. [US EPA · Green Power Purchases at EPA](https://www.epa.gov/greeningepa/green-power-purchases-epa) · EPA's Green Power Contracts. FY 2025: 8.5 million kWh of Green-e certified RECs to supplement onsite generation.
3. [US EPA · Energy Attribute Tracking Systems](https://www.epa.gov/green-power-markets/energy-attribute-tracking-systems) · How tracking systems issue, transfer and track unique claims on certificates representing one MWh.
4. [US EPA · Solar Power Use Claims](https://www.epa.gov/green-power-markets/solar-power-use-claims) · Onsite solar and the different claim conditions when the corresponding RECs are retained, sold or replaced.
5. [Spain · CNMC Circular 1/2018, Guarantees of Origin for Electricity](https://www.boe.es/buscar/act.php?id=BOE-A-2018-5717) · Tenth section, items 1–4. Who may request redemption, the retailer's supply months, and the final customer's entry in the CNMC register by CUPS.
6. [China National Energy Administration · GEC Implementation Rules, 2025 No. 107](https://henb.nea.gov.cn/xxgk/zcfg/202602/t20260203_295284.html) · National rule dated November 28, 2025. Articles 17, 25 and 29–32 cover non-tradable self-consumption GECs, the consumption-claim retirement purpose, the generation and use year match from January 1, 2026, and the retirement information sheet.
7. [China NDRC, Ministry of Finance and NEA · Notice 1044 of 2023 on GECs](https://zfxxgk.nea.gov.cn/2023-07/25/c_1310735434.htm) · Part II, items 1–2. National green electricity certificates for renewable attributes, with one certificate for 1,000 kWh.
8. [Brander, Gillenwater and Ascui · Creative Accounting and Scope 2, 2018](https://www.pure.ed.ac.uk/ws/portalfiles/portal/45626197/BranderEtalEP2017CreativeAccounting.pdf) · Energy Policy 112, pp. 29–33. Sections 3–4 discuss the limits of inferring system effects from contractual inventory results.
9. [GHG Protocol · Scope 2 Market-Based Method Update, October 16, 2026](https://ghgprotocol.org/blog/scope-2-market-based-method-update-2025-2026-public-consultation-current-status) · Executive summary, 2025–2026 Scope 2 Public Consultation, and Next Steps. Status and scope of the proposals after consultation.
10. [GHG Protocol · Scope 2 Workshop Outcomes Overview, November 10, 2026](https://ghgprotocol.org/sites/default/files/2026-11/Scope2-Workshop-Outcomes-Overview-2026.11.10.pdf) · Pages 1–2, proposed hourly and deliverability criteria, unresolved transition, and the intended consultation stage.
11. Worked Example · Electricity Records for One Facility and Six Months · Hypothetical April–September 2026 in the US. 540 MWh used, 420 MWh supported. The onsite RECs for 50 MWh were sold and no replacement RECs were obtained for that volume. Evidence for the other 70 MWh is outstanding.
12. [Bestware Wiki · Check the Scope of a Supplier Sustainability Rating](https://www.bestwaresoda.com/wiki/check-supplier-sustainability-rating-evidence/) · Check which organization, activity and period an external rating covers.
13. [Bestware Wiki · Measure a Commercial Water Dispenser's Energy Use](https://www.bestwaresoda.com/wiki/measure-dispenser-energy-use/) · A use-stage measurement under specified service conditions.

### Continue With These Decisions

- [How to Verify a Supplier Sustainability Rating](https://www.bestwaresoda.com/wiki/check-supplier-sustainability-rating-evidence/)
  
  Check the scope of the supplier’s sustainability rating
- [How to Measure a Commercial Water Dispenser’s Energy Use](https://www.bestwaresoda.com/wiki/measure-dispenser-energy-use/)
  
  Measure the dispenser’s electricity use at the customer site

### Continue Exploring

Related to this article

[Environment & Sustainability 6 min read Updated 2026-11-24 Compare Bottled and On-Site Water Service by the Liter Compare what it takes to serve a liter at the same table. Follow cooling, delivery and empty-bottle returns, and count how many refills actually reach customers. Read article](https://www.bestwaresoda.com/wiki/compare-water-service-environmental-impact/)

Related to this article

[Environment & Sustainability 4 min read Updated 2026-11-25 How to Measure Water and Energy per Glass Served Count the glasses that go out, read the meters on the same clock, and label figures taken from supplier records. Read article](https://www.bestwaresoda.com/wiki/measure-water-service-sustainability/)

Related to this article

[Environment & Sustainability 4 min read Updated 2026-11-25 Do Refill Stations Reduce Bottled Water Purchases? Check orders and bottles handed out before and after the change. Keep the refill display and the stockroom ledger on their own lines. Read article](https://www.bestwaresoda.com/wiki/reduce-disposable-bottles-in-shared-spaces/)

Related to this article