# Check the Finished Cabinet Before Your Water Dispenser Ships

Source: https://www.bestwaresoda.com/wiki/installation-power-and-cooling/
Language: en-US

[Back to Water Wiki](https://www.bestwaresoda.com/wiki/)

Technology & Design

## Check the Finished Cabinet Before Your Water Dispenser Ships

Get the drawing for the exact unit, then check the installed cabinet, power, water and drain against it. A 420 mm opening is wider than the chassis and narrower than the installation drawing requires.

Revised 2026-11-25

A metal water outlet and sink installed in a stone counter

On this page

[A Machine Can Fit Through the Opening and Still Need More Room](https://www.bestwaresoda.com/wiki/installation-power-and-cooling/#section-1) [Draw the Air Path With the Millwork in Place](https://www.bestwaresoda.com/wiki/installation-power-and-cooling/#section-2) [Release the Right Unit and Connections for Delivery](https://www.bestwaresoda.com/wiki/installation-power-and-cooling/#section-3) [Put the Setting You Will Test on the Job Sheet](https://www.bestwaresoda.com/wiki/installation-power-and-cooling/#section-4)

### A Machine Can Fit Through the Opening and Still Need More Room

Before booking a delivery, give the installer and cabinetmaker the same drawing for the exact model. Measure the opening after the hinges, finished panels and nearby appliances are in place. Check whether the unit can be carried in, connected, run behind the closed door and pulled out again when a technician needs it.

Here is the difference on a real drawing. The Bestware G1DS-110/1010 V1.1 manual shows an all-in-one chassis 355 mm wide, 464 mm deep and 438 mm high. Its minimum installation envelope is 425 × 500 × 630 mm, in that same order, including a 35 mm intake gap on each side. A hypothetical 420 mm clear opening has enough width for the chassis and falls 5 mm short of the installation width. Adding a filter unit, fittings or a cylinder calls for marking their own space and access on the same drawing.

[\[1\]](https://www.bestwaresoda.com/wiki/installation-power-and-cooling/#editorial-source-1) [\[5\]](https://www.bestwaresoda.com/wiki/installation-power-and-cooling/#editorial-source-5)

### Draw the Air Path With the Millwork in Place

On pages 9 and 10 the V1.1 manual gives the installer a place to start locating the ventilation grille. Put the actual equipment orientation beside the front and side elevations of the cabinet. Check where the finished grille opens into the room, where fresh air gets back in, and whether a divider, hinge plate or stored supplies will get across that path. A grille cut into a panel should line up with the unit and installed cabinet, so mark it before the panels are made.

In its own account of multi-building installations, Vivreau lists missing access to a shutoff, ventilation and power among the delays its teams see. Bring the plumber, electrician and cabinetmaker in while changes can still be made to the plan. Leave the finished drawing with the building team so a repair crew knows which panels and connections need access.

[Check the cabinet airflow and closed-door test](https://www.bestwaresoda.com/wiki/cooling-airflow-checks/)

[\[1\]](https://www.bestwaresoda.com/wiki/installation-power-and-cooling/#editorial-source-1) [\[6\]](https://www.bestwaresoda.com/wiki/installation-power-and-cooling/#editorial-source-6) [\[4\]](https://www.bestwaresoda.com/wiki/installation-power-and-cooling/#editorial-source-4)

### Release the Right Unit and Connections for Delivery

Ask for a photo of the rating plate or the supplier’s signed electrical schedule for the unit that will ship. The Bestware model page lists 110 V at 60 Hz and 220 V at 50 Hz options, alongside a single 2,100 W catalog field. Send the exact order version and the manual’s socket drawing to the electrician as separate records. Have them match the voltage, frequency, current, plug and circuit protection to the delivered unit. Include any accessory with a separate supply.

On the water line, record the actual approved connection, the location of the shutoff and the supply conditions while water is flowing. Write down where each drain goes. The drip tray and a treatment unit’s reject water can have different outlets, with arrangements set by the installed options and local plumbing requirements. Give each item an owner and a dated confirmation. Release the order once those confirmations and the cabinet drawing agree.

[Open the site installation checklist](https://www.bestwaresoda.com/planning/#installation)

[\[1\]](https://www.bestwaresoda.com/wiki/installation-power-and-cooling/#editorial-source-1) [\[2\]](https://www.bestwaresoda.com/wiki/installation-power-and-cooling/#editorial-source-2) [\[3\]](https://www.bestwaresoda.com/wiki/installation-power-and-cooling/#editorial-source-3) [\[7\]](https://www.bestwaresoda.com/wiki/installation-power-and-cooling/#editorial-source-7)

### Put the Setting You Will Test on the Job Sheet

Get the delivery crew’s route on the same sheet. Walk the doorway, lift and tighter turns with the unit dimensions and the supplier’s shipping dimensions to hand. Give the technician a way to take out the equipment and change filters later, with the finished counter still in place. For a planned 38 mm countertop, this manual’s mounting details allow up to 40 mm at the tap and 36 mm at the drip tray. Have the fabricator resolve the tray location before cutting.

At commissioning, run the agreed pours with the door shut. Record what is connected, leak and drain checks, the outlet mode, inlet conditions and the result at the actual counter. Include a check of the airflow openings and access to the shutoff. Hand those notes, the exact order drawing and the dates of any outstanding work to the person who will be called when the next service issue comes up.

[\[1\]](https://www.bestwaresoda.com/wiki/installation-power-and-cooling/#editorial-source-1) [\[5\]](https://www.bestwaresoda.com/wiki/installation-power-and-cooling/#editorial-source-5)

### Sources for This Edition

1. [Bestware · G1DS-110 and G1DS-1010 installation manual, 2026 V1.1](https://www.bestwaresoda.com/assets/documents/g1ds-110-g1ds-1010-installation-manual-2026-v1.1-en.pdf) · Physical PDF pp. 9–10, printed 13–16. Placement envelope, 35 mm side intake gaps, order-dependent supply drawing, cabinet grille and counter thickness by part.
2. [Bestware · G1DS-110 model specifications](https://www.bestware-sparkling.com/Products/Commercial-Sparkling-Water-Dispensers/All-in-one/G1DS-110) · All-in-one Unit fields. The page lists power supply options and a single catalog power rating; use the delivered variant’s order information.
3. [UK Health and Safety Executive · Electricity frequently asked questions](https://www.hse.gov.uk/electricity/faq.htm) · How do I know if my electrical equipment is safe? Checks tailored to use and competence for specialized equipment. UK guidance.
4. Vivreau · Water Dispenser Plumbing and Site Requirements · Manufacturer’s firsthand installation notes, opening and Who Handles What Before Install Day. Source wording pertains to its own rollouts.
5. Bestware editorial example · Finished cabinet and counter fit · Hypothetical 420 mm usable opening versus the 425 mm installation width, and a 38 mm counter compared with two separate fittings.
6. [Bestware Wiki · Checking cooling airflow](https://www.bestwaresoda.com/wiki/cooling-airflow-checks/) · Inspect the grille and test with the cabinet in its final state.
7. [Bestware Planning · Site installation checklist](https://www.bestwaresoda.com/planning/#installation) · The installation section of the planning tool, with site items and unresolved work.

### Continue With These Decisions

- [How to Plan and Check Airflow in a Water Chiller Cabinet](https://www.bestwaresoda.com/wiki/cooling-airflow-checks/)
  
  Check the cabinet airflow and closed-door test
- [Water Service Planner](https://www.bestwaresoda.com/planning/)
  
  Open the site installation checklist

### Continue Exploring

Related to this article

[Technology & Design 3 min read Updated 2026-11-25 How to Plan a Remote Water Dispenser Line Trace the fitted route before you order the chiller. Then check the first glass after a quiet stretch and the next four at the tap. Read article](https://www.bestwaresoda.com/wiki/plan-remote-water-dispensing-lines/)

Related to this article

[Technology & Design 3 min read Updated 2026-11-25 How to Plan Drinking-Water Access at School Start with the places students need water during lunch, short breaks and sports. Then check the route, the time it takes to fill a bottle and the backup when an outlet is closed. Read article](https://www.bestwaresoda.com/wiki/plan-school-campus-water-access/)

Related to this article

[Technology & Design 3 min read Updated 2026-11-24 Replacing a Commercial Tap? Measure the Existing Counter First If your sink has a 22 mm hole, the diameter fits the AS112 cutout range. Check the cold supply, the mounting surface and the room underneath before ordering. Read article](https://www.bestwaresoda.com/wiki/replace-water-fixtures-in-existing-counters/)

Related to this article

Four-in-One Water Dispenser Installation
