# How to Document Drinking Water for a WELL Project

Source: https://www.bestwaresoda.com/wiki/document-water-for-well-building-projects/
Language: en-US

[Back to Water Wiki](https://www.bestwaresoda.com/wiki/)

Water & Science

## How to Document Drinking Water for a WELL Project

Match the registered WELL version to a fixture map, the test plan and the supplier records that describe what actually went into the building.

Revised 2026-11-25

Sample bottles, forms and an insulated cooler prepared on a laboratory bench

On this page

[Open the Project Scorecard Before Ordering Equipment](https://www.bestwaresoda.com/wiki/document-water-for-well-building-projects/#section-1) [Walk the Route From the Building Inlet to the Cup](https://www.bestwaresoda.com/wiki/document-water-for-well-building-projects/#section-2) [Put the Testing Method Beside the Fixture ID](https://www.bestwaresoda.com/wiki/document-water-for-well-building-projects/#section-3) [Keep the Supply Report, Product File and Site Result Together](https://www.bestwaresoda.com/wiki/document-water-for-well-building-projects/#section-4) [Make the Record Work After the First Review](https://www.bestwaresoda.com/wiki/document-water-for-well-building-projects/#section-5)

### Open the Project Scorecard Before Ordering Equipment

Before ordering a dispenser, ask the project’s WELL lead which version and addenda apply, which parts of the building are covered and which water features or strategies are on the scorecard. Put those details on the first page of the job’s water file. The testing agent and the plumbing contractor can then work from the same plan.

In the August 2025 guidebook, WELL v2 maps turbidity and coliforms to Part 1 of W01, Water Quality Indicators. The v2 pilot puts the two in separate parts of W01, and v1 calls them parts 1 and 2 of Feature 30. WELL v2’s Q4 2022 addenda also changed W02, Drinking Water Quality, to an on-site performance test. Copy the identifiers and verification type from the registered project before commissioning any test.

On November 25, 2026, IWBI describes One WELL early enrollment as residential only and schedules documentation upload and review for mid-April 2027. In this enrollment path, WELL Residence has no mandatory on-site performance testing. Bronze through Platinum Certification includes strategies that require on-site testing. Where the residential guidebook calls for water testing, it uses W3.1 for turbidity and coliforms and W3.2 through W3.4 for laboratory-based parameters.

[\[1\]](https://www.bestwaresoda.com/wiki/document-water-for-well-building-projects/#editorial-source-1) [\[2\]](https://www.bestwaresoda.com/wiki/document-water-for-well-building-projects/#editorial-source-2) [\[3\]](https://www.bestwaresoda.com/wiki/document-water-for-well-building-projects/#editorial-source-3) [\[4\]](https://www.bestwaresoda.com/wiki/document-water-for-well-building-projects/#editorial-source-4) [\[5\]](https://www.bestwaresoda.com/wiki/document-water-for-well-building-projects/#editorial-source-5)

### Walk the Route From the Building Inlet to the Cup

On the plumbing drawing, locate the building inlet, any central treatment and the branches feeding the project. Then walk the floor. Give each drinking or cooking outlet a unique code, mark the floor and room, and note any local filter, dispenser reservoir or branch valve. Include the other fixtures the testing agent may need, such as a handwashing sink for W01. A tenant needs a contact for equipment or cupboards controlled by the landlord.

Toronto’s TD23 office renovation earned WELL v1 Gold in 2016. Early planning brought the landlord and project team together. Rebecca Melnyk’s report records air and water checks on another renovated floor and carbon filtration on the base-building system, alongside enhanced water filtration at the tap. The interventions occupied different places in the building. Use that division to decide who provides records and who can open each part of the route during the testing visit.

[\[6\]](https://www.bestwaresoda.com/wiki/document-water-for-well-building-projects/#editorial-source-6) [\[7\]](https://www.bestwaresoda.com/wiki/document-water-for-well-building-projects/#editorial-source-7) [\[2\]](https://www.bestwaresoda.com/wiki/document-water-for-well-building-projects/#editorial-source-2)

### Put the Testing Method Beside the Fixture ID

Suppose a 3,000 m² office project uses the general water table in the August 2025 guidebook. It lists two locations for turbidity and coliforms and one for disinfectants and laboratory-based parameters in that size band. For the first group, include a handwashing or bathing fixture and a drinking or cooking fixture where present. For the latter testing, a building-connected drinking dispenser without a point-of-use filter takes priority if available. Ask the testing agent to apply the guide’s floor and riser priorities. In project areas spanning three or more floors, including basements, the guide calls for at least one sample on either of the top two. Leave room for the agent to reach each outlet.

Keep the raw measurement or the laboratory result beside the sampling date, source ID, method and operating conditions. The 2025 guide calls for cold water, or the coldest setting on a mixer, for its water tests. Turbidity uses three readings at each selected location. The coliform test uses a laboratory sample. Have the laboratory supply its containers and confirm transport requirements. In the guide’s separate group of laboratory-based parameters, report a non-detect as below the method’s detection limit and retain that limit.

[\[2\]](https://www.bestwaresoda.com/wiki/document-water-for-well-building-projects/#editorial-source-2) [\[1\]](https://www.bestwaresoda.com/wiki/document-water-for-well-building-projects/#editorial-source-1)

### Keep the Supply Report, Product File and Site Result Together

The utility report documents the supply over the period it covers. The equipment file should identify the exact assembly and cartridge, and show which listed claim applies to that combination and under what conditions. The project test records water at a selected outlet, in the installed configuration on the day of sampling. Filing all three under the fixture or supply branch lets the buyer see what each one establishes.

For a replacement, compare the delivered model and cartridge to the listing before the crew installs it. Record a substitution against the fixture IDs that will receive it. If the proposal uses the Works with WELL mark, ask for the specific registered product or service and the approved strategy alignment. That product program has its own review. The building project keeps its separate verification records.

[Match a product certificate to the exact model and claim](https://www.bestwaresoda.com/wiki/read-certification-correctly/)

[\[1\]](https://www.bestwaresoda.com/wiki/document-water-for-well-building-projects/#editorial-source-1) [\[9\]](https://www.bestwaresoda.com/wiki/document-water-for-well-building-projects/#editorial-source-9) [\[10\]](https://www.bestwaresoda.com/wiki/document-water-for-well-building-projects/#editorial-source-10)

### Make the Record Work After the First Review

UNC Chapel Hill’s lead investigation recorded a sample number, building, floor, room, fixture type and sample sequence from 2022 to 2023. The published study covers 5,954 tests at 3,825 fixtures. The campus investigation followed EPA guidance. A facilities team can use the same kind of log to find the exact fixture behind a laboratory result.

At handover, name the person who updates the fixture map, the one who accepts replacement parts and the contact who agrees the next sampling decision. Keep the model, cartridge and service change with the original result. If a tenant branch is rerouted or equipment is replaced, mark the affected locations and confirm the follow-up with the testing team. When an outlet returns to service, the next shift can see what changed and what was checked.

[Build the fixture map and change log into the installation handover](https://www.bestwaresoda.com/wiki/water-system-installation-and-handover/)

[\[8\]](https://www.bestwaresoda.com/wiki/document-water-for-well-building-projects/#editorial-source-8) [\[2\]](https://www.bestwaresoda.com/wiki/document-water-for-well-building-projects/#editorial-source-2) [\[11\]](https://www.bestwaresoda.com/wiki/document-water-for-well-building-projects/#editorial-source-11)

### Sources for This Edition

1. [IWBI — WELL Performance Verification](https://www.wellcertified.com/performance-verification) · Types of Performance Verification and the examples of third-party onsite testing and documentation review.
2. [IWBI — WELL Performance Verification Guidebook, Version 2025-03](https://a.storyblok.com/f/52232/x/5b427eb8e4/well-performance-verification-guidebook_q3-2025.pdf) · Published August 13, 2025. Printed pp. 14–16 (PDF pp. 15–17), Water, feature mapping, quantities, location priorities, test methods and reporting.
3. [IWBI — Key Enhancements in the Q4 2022 Addenda](https://resources.wellcertified.com/articles/q4-2022-addenda/) · Water bullet for W02: on-site performance test and the Performance Testing Agent’s remit for W01, W02 and W04.
4. IWBI — One WELL Early Enrollment for Residential Projects FAQ · General and New Enrollment Questions, checked November 25, 2026. Residential-only early enrollment, upload and review planned for mid-April 2027, and different onsite testing requirements by achievement.
5. [IWBI — WELL Performance Verification Guidebook for Residential Projects](https://a.storyblok.com/f/52232/x/48040e117e/well-performance-verification-guidebook-for-residential-projects.pdf) · 2026 guide, Water, printed pp. 21–25. Table 4 maps turbidity and coliforms to W3.1 and laboratory-based parameters to W3.2, W3.3 and W3.4.
6. [Canada Green Building Council — TD Bank Group’s Toronto Office Certifies WELL Gold](https://www.cagbc.org/green-building-showcase/green-building-spotlight/case-studies/leed_spotlight_2016-06_td_bank_group_toronto_office/) · June 30, 2016. TD23 project scope, WELL v1 certification, water filtration and interviews with TD and the building owner.
7. [Rebecca Melnyk — How TD Bank HQ Achieved WELL Certification](https://www.reminetwork.com/articles/how-td-bank-hq-achieved-well-certification/) · June 14, 2016. Initial steps and WELL features achieved. Reports the early test floor and carbon filtration on the base-building system.
8. [Bousquet et al. — Identifying and Responding to Lead in Drinking Water in a University Setting](https://mdpi-res.com/d_attachment/ijerph/ijerph-21-00561/article_deploy/ijerph-21-00561-v2.pdf) · 2024, §§2.2 and 3.1. Sample tracking details and the 2022–2023 UNC Chapel Hill testing campaign.
9. [IWBI — Works with WELL](https://www.wellcertified.com/works-with-well) · The program is product licensing. IWBI describes selected alignment, with building-level WELL Certification offered separately.
10. [Bestware Wiki — Reading a Product Certificate](https://www.bestwaresoda.com/wiki/read-certification-correctly/) · Match the exact product, variant and claim to the evidence before accepting it.
11. [Bestware Wiki — Water System Installation and Handover](https://www.bestwaresoda.com/wiki/water-system-installation-and-handover/) · Record installed configuration, responsibility, checks and handover documents.

### Continue With These Decisions

- [How to Check a Water Equipment Certificate Before You Buy](https://www.bestwaresoda.com/wiki/read-certification-correctly/)
  
  Match a product certificate to the exact model and claim
- [Water Dispenser Installation and Handover: What to Sign Off](https://www.bestwaresoda.com/wiki/water-system-installation-and-handover/)
  
  Build the fixture map and change log into the installation handover

### Continue Exploring

Related to this article

[Technology & Design 4 min read Updated 2026-11-25 How to Specify an Accessible Drinking Water Point Decide which fixtures the site needs, then verify reach, clearance and a real bottle fill after installation. U.S. ADA measurements depend on the fixture and approach. Read article](https://www.bestwaresoda.com/wiki/accessible-drinking-water-points/)

Related to this article

[Technology & Design 3 min read Updated 2026-11-25 Planning Drinking Water Access in France Put a visitor’s bottle refill, a diner’s request and an employee’s shift on the same floor plan. Check who can reach each supply when they need it. Read article](https://www.bestwaresoda.com/wiki/plan-drinking-water-access-in-france/)

Related to this article

[Technology & Design 5 min read Updated 2026-11-24 How to Test a Commercial Water Dispenser Before You Accept It Set the pass conditions with your installer, log the first and busiest pours, then check how the unit returns to service after a rush or maintenance. Read article](https://www.bestwaresoda.com/wiki/plan-water-equipment-pilot-acceptance/)

Related to this article
