# Bestware’s Chicago Show Display and Three Checks for Restaurant Buyers

Source: https://www.bestwaresoda.com/journal/bestware-national-restaurant-show-2026/
Language: en-US

[Back to Journal](https://www.bestwaresoda.com/journal/)

Company updates

## Bestware’s Chicago Show Display and Three Checks for Restaurant Buyers

Bestware’s May 18 show report lists sparkling-water dispensers, pre-rinse faucets and sensor faucets. Here is what each category calls for in a restaurant quote and on-site trial.

Source date 2026-05-18 · Revised 2026-11-25

Visitors at the Bestware National Restaurant Association Show booth

On this page

[Three Water Tasks on One Chicago Stand](https://www.bestwaresoda.com/journal/bestware-national-restaurant-show-2026/#section-1) [Describe the First Rush at the Beverage Station](https://www.bestwaresoda.com/journal/bestware-national-restaurant-show-2026/#section-2) [Bring the Sink Dimensions to the Faucet Quote](https://www.bestwaresoda.com/journal/bestware-national-restaurant-show-2026/#section-3) [Check the Sensor With the Basin in Place](https://www.bestwaresoda.com/journal/bestware-national-restaurant-show-2026/#section-4) [Leave the Show With a Testable Quote](https://www.bestwaresoda.com/journal/bestware-national-restaurant-show-2026/#section-5)

### Three Water Tasks on One Chicago Stand

The Bestware stand photograph shows pre-rinse sprayers with spring supports above the counter, a panel for sparkling-water dispensers and people gathered in front. The National Restaurant Association Show took place May 16–19, 2026, at McCormick Place. Bestware’s report is dated May 18, during the show. It gives 3220 (3220D) as the stand and lists sparkling-water dispensers, pre-rinse faucets and sensor faucets.

For a restaurant buyer, the display is a way to get three conversations started. A beverage outlet needs to keep service moving through a rush. A pre-rinse valve has to reach the part of the sink the crew actually uses. A sensor faucet has to work over its own basin. Start the quote with the station and task, then fill in the proposed model on each line.

[\[1\]](https://www.bestwaresoda.com/journal/bestware-national-restaurant-show-2026/#editorial-source-1) [\[2\]](https://www.bestwaresoda.com/journal/bestware-national-restaurant-show-2026/#editorial-source-2) [\[3\]](https://www.bestwaresoda.com/journal/bestware-national-restaurant-show-2026/#editorial-source-3)

### Describe the First Rush at the Beverage Station

How many drinks do staff need to serve, and how quickly do those orders arrive? In a planning example, 60 servings at 250 mL require 15 L in fifteen minutes. A few tables ordering at once can make the first minutes harder than the totals suggest. Use the actual serving sequence to schedule a short trial, then check how the outlet recovers before the next group.

A current Bestware catalog example shows why the fields on the quote matter. For the G1DS-123, the specification gives a chilling rating of 40 L/h and a sparkling-water outlet maximum of 3 L/min. Record both on separate lines and ask the supplier to show what happens during consecutive sparkling pours at the site. The May show report identifies the display at the product-category level.

[Calculate demand for the busiest service window](https://www.bestwaresoda.com/wiki/size-for-peak-demand/)

[\[2\]](https://www.bestwaresoda.com/journal/bestware-national-restaurant-show-2026/#editorial-source-2) [\[4\]](https://www.bestwaresoda.com/journal/bestware-national-restaurant-show-2026/#editorial-source-4) [\[10\]](https://www.bestwaresoda.com/journal/bestware-national-restaurant-show-2026/#editorial-source-10) [\[6\]](https://www.bestwaresoda.com/journal/bestware-national-restaurant-show-2026/#editorial-source-6)

### Bring the Sink Dimensions to the Faucet Quote

If a remodel keeps the old sink, begin with the existing hole and the space behind it. For example, the current AS112 specification lists a single cold-water supply, a single-hole deck mount and a 21–23 mm opening. Those details tell a project team what to compare with the counter drawing before choosing a hose, valve or optional outlet.

Once the drawing fits, test the task. Use the actual bowl and the trays staff handle, with water running under the planned supply conditions. Record whether the head reaches the working area, whether the hose catches as it returns and whether the installation keeps service access clear.

[Set the pre-rinse spray-valve acceptance checks](https://www.bestwaresoda.com/wiki/accept-pre-rinse-spray-valves/)

[\[5\]](https://www.bestwaresoda.com/journal/bestware-national-restaurant-show-2026/#editorial-source-5) [\[7\]](https://www.bestwaresoda.com/journal/bestware-national-restaurant-show-2026/#editorial-source-7)

### Check the Sensor With the Basin in Place

Ask the installer to show where hands meet the stream and what movement makes the valve open. Test with the intended basin, normal lighting and the actual power arrangement. Then check the shutoff when hands leave and the access needed for cleaning and replacing service parts. This gives the crew a result they can check again after the handoff.

[Test the sensor faucet over the installed basin](https://www.bestwaresoda.com/wiki/accept-sensor-faucets-in-the-installed-basin/)

[\[2\]](https://www.bestwaresoda.com/journal/bestware-national-restaurant-show-2026/#editorial-source-2) [\[8\]](https://www.bestwaresoda.com/journal/bestware-national-restaurant-show-2026/#editorial-source-8)

### Leave the Show With a Testable Quote

An operator preparing a new counter can write the beverage draw, the rinse position and the sensor basin as three acceptance lines. Give each line a model reference, a drawing or installation condition, and a person who can observe the result. When the quoted configuration changes, update the line and repeat the check that depends on it.

The Chicago photograph and the May 18 report document what Bestware brought to the show at the product-group level. The final configuration, quote and measurements belong in the project’s own handoff record.

[Prepare the on-site trial and sign-off record](https://www.bestwaresoda.com/wiki/plan-water-equipment-pilot-acceptance/)

[\[2\]](https://www.bestwaresoda.com/journal/bestware-national-restaurant-show-2026/#editorial-source-2) [\[3\]](https://www.bestwaresoda.com/journal/bestware-national-restaurant-show-2026/#editorial-source-3) [\[9\]](https://www.bestwaresoda.com/journal/bestware-national-restaurant-show-2026/#editorial-source-9) [\[10\]](https://www.bestwaresoda.com/journal/bestware-national-restaurant-show-2026/#editorial-source-10)

### Sources for This Edition

1. [National Restaurant Association Show · 2026 Schedule at a Glance](https://www.nationalrestaurantshow.com/Home/schedule-at-a-glance/) · Day 1–4 program, May 16–19, 2026, Chicago. Day 3 is May 18. The schedule is the 2026 program, including where the show took place.
2. [Bestware Stainless · Report From the National Restaurant Association Show](https://www.bestware-stainless.com/News%26Blog/Bestware-at-NRA-Show-2026-USA-Showcasing-Commercial-Stainless-Steel-Water-Solutions) · Dated May 18, 2026. See Event Information and Featured Products. The company reports that it was exhibiting, gives 3220 (3220D) as its stand and identifies the three product groups.
3. [Bestware Stainless · First Photograph in the May 18 Show Report](https://www.bestware-stainless.com/upload/editorimg/202605/18100355453.webp) · First photo in the article. The booth fascia, visitors and counter displays are visible. Matching source for the approved local show image.
4. [Bestware · G1DS-123 Product Specification](https://www.bestware-sparkling.com/Products/Commercial-Sparkling-Water-Dispensers/4-in-1/G1DS-123) · Specifications, chilling group. Chilling Capacity 40 L/h and Sparkling Capacity Max 3 L/min. Current catalog example, distinct from the show inventory.
5. [Bestware Stainless · AS112 Product Specification](https://www.bestware-stainless.com/Products/Pre-Rinse-Faucets/American-Style/AS112) · Model AS112 specification. Single cold-water supply, single-hole deck mount and Φ21–23 mm installation opening. Current catalog example.
6. [Bestware Wiki · Sizing for Peak Demand](https://www.bestwaresoda.com/wiki/size-for-peak-demand/) · Use order volume, serving window and peak conditions to define what the outlet needs to deliver.
7. [Bestware Wiki · Accepting Pre-rinse Spray Valves](https://www.bestwaresoda.com/wiki/accept-pre-rinse-spray-valves/) · Check water supply, the exact spray assembly and actual washing task during acceptance.
8. [Bestware Wiki · Testing Sensor Faucets in the Installed Basin](https://www.bestwaresoda.com/wiki/accept-sensor-faucets-in-the-installed-basin/) · Test placement, activation and shutoff on the actual basin and verify access to the power and service parts.
9. [Bestware Wiki · Planning On-site Water Equipment Pilot Acceptance](https://www.bestwaresoda.com/wiki/plan-water-equipment-pilot-acceptance/) · Agree on the setup, observation record and sign-off conditions before installation.
10. Illustrative Restaurant Project Handoff · A fictional planning example for three water uses. Sixty 250 mL servings total 15 L in a 15-minute window. The example describes buyer demand and supplies no show result.

### Continue With These Decisions

- [How Much Chilled Water Does Your Busiest Half Hour Need?](https://www.bestwaresoda.com/wiki/size-for-peak-demand/)
  
  Check the method and what to record.
- [How to Test a Commercial Pre-Rinse Spray Valve Before You Accept It](https://www.bestwaresoda.com/wiki/accept-pre-rinse-spray-valves/)
  
  Check the method and what to record.
- [How to Test a Sensor Faucet in the Installed Basin](https://www.bestwaresoda.com/wiki/accept-sensor-faucets-in-the-installed-basin/)
  
  Check the method and what to record.
- [How to Test a Commercial Water Dispenser Before You Accept It](https://www.bestwaresoda.com/wiki/plan-water-equipment-pilot-acceptance/)
  
  Check the method and what to record.

### Continue Exploring

Related to this article

[Industry & Markets 3 min read Source date 2026-10-14 A New Water Plant Opens in Hot Springs With Three Bottling Lines One retail line, two large-format lines and a warehouse are part of Primo Brands’ new Arkansas plant. City records and the opening release capture different stages of the expansion. Read article](https://www.bestwaresoda.com/journal/arkansas-bottled-water-factory-opening-2026/)

Related to this article

[Industry & Markets 3 min read Updated 2026-11-25 Why Water Equipment Quotes Differ Put the two proposals side by side at the point where the system can serve water. Then price the first two years with the same parts, visits and service assumptions. Read article](https://www.bestwaresoda.com/wiki/understand-water-equipment-price-differences/)

Related to this article

[Industry & Markets 3 min read Source date 2026-08-22 Bestware at Horecava 2027 and Aquatech China 2026 Horecava lists Bestware at stand 02.403 in January. What the company showed in Shanghai helps buyers decide what to bring and ask about in Amsterdam. Read article](https://www.bestwaresoda.com/journal/bestware-aquatech-horecava-calendar/)

Related to this article
